Reference Materials for the e+e- Workshop
Illinois Institute of Technology
March 9 - 11, 2001


An e+e- Top Factory in a 50 + 50 TeV Hadron Collider Tunnel, J. Norem et al.

LEP Operation and Performance with Electron-Positron Collisions at 209 GeV, R. W. Assmann.

A Method for Simultaneous Optimisation of Orbit and Dispersion in Storage Rings, R. Assmann et al.

Luminosity and Beam Measurements Used for Performance Optimisation in the LEP Collider, R. Assmann et al.

A Very Large Lepton Collider in the VLHC Tunnel, T. Sen and J. Norem.

LEP Operation and Performance with 100 GeV Colliding Beams, G. Arduini et al.

The Beam-Beam Interaction in the Presence of Strong Radiation Damping, R. Assmann and K. Cornelis.

Parameter Lists at Different Energies, T. Sen.

Staged Parameters for VLHC.